Skip to content

In development

Completion design that shows its working.

CompletionLab is a web toolkit being built for completion engineers: a schematic drawn from the tally, calculators that print their relation, casing design checked against named load cases, and the equipment they all pick from. Every method is published before the software — so you can check it now.

In development · Nothing to install · No account required

Design preview

Built for

The people whose arithmetic gets reviewed.

Six jobs that do cased-hole calculations on a normal day, and the one each of them opens first.

  • Completion engineers

    Reaches for the column, before anything is opened up — hydrostatic pressure.

  • Workover supervisors

    Reaches for kill weight and the pressures to hold on the way round — kill sheet.

  • Wireline engineers

    Reaches for where the tool is, against where the log says it is — depth correlation.

  • Well integrity engineers

    Reaches for what the shoe will take at the weight in the hole now — formation integrity.

  • Production technologists

    Reaches for capacity and volume for every string in the hole — several strings in one hole.

  • Intervention consultants

    Reaches for volumes and strokes, and where the interface actually is — displacement and pills.

What is being built

Five tools that describe one well.

A schematic drawn from the tally, a tally whose depths cannot drift, calculators that show their relation, a casing design checked against named load cases, and the equipment they all pick from. The schematic builder, tally, calculators and casing design are in development; the equipment database is planned.

In development

Schematic builder

The well, drawn from what is actually in it

A completion schematic built from the strings and equipment you list rather than drawn by hand: casing and tubing with their tops and shoes, packers and nipples at the depth the tally gives them, and the perforated interval. Change a length and the drawing moves, because the drawing cannot disagree with the data behind it.

  • Every item at the depth the tally puts it, never retyped
  • Casing strings, tubing and the equipment between them in one vertical section
  • One well file holds the schematic, the casing programme and the tally together
In development

Tally

Joints, lengths and depths that always add up

A running tally of what goes in the hole: each joint or tool with its length and linear weight, and the top and bottom depths derived from those lengths rather than typed. Each row’s top is the previous row’s bottom — the same number — so the sheet can never show a gap that is only rounding.

  • Depths derived from stored lengths, never stored themselves
  • Pipe mass in air from the linear weights, with tools left out of it
  • The same tally the schematic is drawn from
In development

Calculators

The cased-hole arithmetic, with the relation shown

Hydrostatic and differential pressure, hook load and buoyancy, and volumes and displacement first, with the rest of the catalogue on this site to follow. Every result is to be printed with the relation and your own figures substituted into it, in field units with SI alongside.

  • The relation printed with your numbers in it, so an answer is checked by reading a line
  • Field units first, SI alongside, converted exactly rather than by a rounded constant
  • The method for each one is published on this site before the calculator exists
In development

Casing design

Loads, ratings and the margin between them

Setting depths from the pore and fracture window, string selection, and each string checked against burst, collapse, tension and triaxial limits for the load cases a completion actually sees: kicks, tubing leaks, temperature, drag and buckling. The rating, the de-rated rating and the factor between them, with the rule set named.

  • Setting depths and kick tolerance from the pressure window
  • Burst, collapse, tension and triaxial checks for named load cases
  • Design versions kept by name, so a revision can be compared with the last
Planned

Equipment database

Tubulars and tools, as templates you can run

A catalogue of tubulars and completion equipment — casing and tubing sizes, packers, nipples and the rest — with templates and assemblies that can be added to a string in one step. The one part of CompletionLab with nothing built yet.

  • Casing and tubing sizes by designation
  • Templates and assemblies added to a string in one step
  • The source the schematic and the tally will pick from

Calculators

The calculations a cased-hole day is made of.

Pressure, fluids, wellbore geometry, tubulars and depth control. None of them are built yet. What is published for each is the relation it will use, the units it expects and what it assumes — that part you can check today.

Planned

Pressure

Hydrostatic pressure

Column pressure at depth, and the margin either side of it

The first number on almost every cased-hole programme: what a static column of one fluid exerts at a given true vertical depth. It will take density in any of the units the industry actually writes it in, and give back the pressure, the gradient and the equivalent mud weight together, because those three are the same statement and quoting one without the others is how a margin gets misread.

  • Density in ppg, specific gravity, lb/ft³ or kg/m³
  • Pressure, gradient and equivalent mud weight from one entry
  • Overbalance against a stated pore or fracture pressure

P = 0.052 × MW × TVD

Re-derived
Planned

Fluids

Fluid column

Layered columns and the U-tube between them

A well is rarely full of one fluid. This handles the stack: brine over mud over cement, a gas cap, a spacer in the middle, and works out what the column exerts at any depth and where the two sides of a U-tube come to rest. The answer to "will it flow back when I open it" is a column balance, not a single hydrostatic.

Re-derived
Planned

Wellbore

Several strings in one hole

Capacity when two strings share an annulus at the same depth

The capacity that is left when two or more strings occupy the same depth — a dual completion, a velocity string run alongside a tubing, or control lines and encapsulation taken off the annulus rather than ignored. AT THE SAME DEPTH is the whole of the difference: with one string at any given depth the annular area is π/4(D² − d²), and that single-string case is not what this entry covers. Two or more at once makes it π/4(D² − Σdᵢ²), which is what this entry adds.

Re-derived
Planned

Pressure

Kill sheet

Kill weight, circulating pressures and the pressure schedule

The arithmetic behind a driller's or wait-and-weight kill: kill weight from shut-in drillpipe pressure, initial and final circulating pressure, and the pressure step-down schedule from surface to bit. It is a small set of relations that has to be right under time pressure, which is exactly the case for having it laid out rather than done on a whiteboard.

Re-derived
Planned

Logging

Depth correlation

CCL and gamma ray tied back to a reference log

Depth correction for a cased-hole run: matching casing collars and gamma-ray markers against the reference log, and carrying the correction through to a perforating or setting depth. The number that matters is the shift applied and the confidence in it, which is why both will be reported rather than a single corrected depth.

Sourced
Planned

Tubulars

Tubing forces

Length change and packer loads through the four effects

Tubing movement and packer load through the classical four effects — piston, buckling, ballooning and temperature — for the pressure and temperature changes a completion sees between running, testing, stimulating and producing. The temperature term alone is often the largest and the one most often left out.

Needs review

Checkable today

Take one and check it.

Nothing here computes yet. That is not a reason to take the method on trust — every relation in the catalogue is published, most of them with a worked example, and this is one of them.

The figures below are recomputed by the test suite on every build, so the arithmetic on the page cannot drift from the relation it claims to be working. If one of them is wrong, that is a bug rather than a typo, and it is worth telling us about.

The whole method

Worked example

Re-derived

Example Well A, checking the column before opening up.

Given

MW
11.2 ppg
TVD
8,450 ft

Working

  1. 01Gradient
    12 ÷ 231 × 11.20.58182 psi/ft
  2. 02Hydrostatic pressure
    0.58182 × 8,4504,916.36 psi

Worth knowing

Worked with 0.052 instead of the exact ratio the same column comes out at 4,921.28 psi — 4.92 psi high. That is the 0.1% the assumptions mention, and it is why the calculator will carry the ratio and round only for display.

Why CompletionLab

Built to be checked, not just to be right.

Most completion arithmetic runs on a spreadsheet that has been emailed between four companies and whose author has left. It usually works. What it cannot do is say where a number came from.

Built

The method is published first

Every calculator states its relation, the units it expects and what it assumes — before the calculator exists. That is checkable today, and it is the part a reviewer actually asks for.

In development

One well, one file

The schematic, the casing programme and the tally will describe the same well and travel together as one file you keep — depths derived from lengths, so the drawing and the sheet cannot disagree.

In development

Nothing to install

CompletionLab is being built for the browser: open a tab, describe the well, and every calculation runs on your own machine. No installer, no updater, and nothing that phones home.

A cased-hole completion in vertical section: surface and production casing, cemented annulus, tubing landed in a packer above a perforated interval, and the fluid column standing in both.TVD

Scope

From the shoe track to the wellhead.

What the column exerts, what the annulus holds, what the tubing does under load, where the tool actually is on depth — and the strings and equipment the schematic is drawn from.

  1. 01

    Read the method

    Every calculator publishes its relation, the units it expects, what it assumes and where it came from. That part exists now, and it is the part worth arguing with while the design is still open.

  2. 02

    Check the relation, not the number

    Each tool is being built to print the relation with your own figures substituted into it, so checking an answer will mean reading one line rather than trusting a number.

  3. 03

    Hand over the derivation

    Send the whole thing — inputs, assumptions and intermediate steps — to whoever has to check it, rather than a single figure they have to take on trust.

Verifiable

What is true today.

Four figures derived from the catalogue on every build, rather than usage statistics we would have to make up.

methods published, with units and assumptions
13
worked examples, recomputed on every build
11
relations re-derived from first principles
6
accounts, cookies or trackers
0

And one that is not flattering: 4 of the published methods rest on coefficients that still need a completion engineer to confirm. They are listed, and they are marked as such on every card they appear on.

Questions

The obvious ones.

Three of the 22 answered in full on the support page — mostly about what does and does not exist yet.

All questions

Being built for people who get checked.

CompletionLab is in development: the methods are published and the tools themselves are being written. The calculators will never need an account.