Skip to content

Features

Five tools, one well, and what each of them will do.

CompletionLab is five tools around a single well: describe it once, and the schematic, the tally, the calculators and the casing design all read the same thing. The schematic builder, tally, calculators and casing design are in development; the equipment database is planned. The drawings below are design figures rather than screenshots, and every sentence is written in the tense its badge allows.

In development01 / 05

Schematic builder

The well, drawn from what is actually in it

A completion schematic built from the strings and equipment you list rather than drawn by hand: casing and tubing with their tops and shoes, packers and nipples at the depth the tally gives them, and the perforated interval. Change a length and the drawing moves, because the drawing cannot disagree with the data behind it.

  • Every item at the depth the tally puts it, never retyped
  • Casing strings, tubing and the equipment between them in one vertical section
  • One well file holds the schematic, the casing programme and the tally together
Schematic builder: the well, drawn from what is actually in itTVD
In development02 / 05

Tally

Joints, lengths and depths that always add up

A running tally of what goes in the hole: each joint or tool with its length and linear weight, and the top and bottom depths derived from those lengths rather than typed. Each row’s top is the previous row’s bottom — the same number — so the sheet can never show a gap that is only rounding.

  • Depths derived from stored lengths, never stored themselves
  • Pipe mass in air from the linear weights, with tools left out of it
  • The same tally the schematic is drawn from
Tally: joints, lengths and depths that always add upL₃JTLENGTHMD01L₁d₁02L₂d₂03L₃d₂ + L₃04L₄d₄05L₅d₅5 jtsd₅ = Σ L
In development03 / 05

Calculators

The cased-hole arithmetic, with the relation shown

Hydrostatic and differential pressure, hook load and buoyancy, and volumes and displacement first, with the rest of the catalogue on this site to follow. Every result is to be printed with the relation and your own figures substituted into it, in field units with SI alongside.

  • The relation printed with your numbers in it, so an answer is checked by reading a line
  • Field units first, SI alongside, converted exactly rather than by a rounded constant
  • The method for each one is published on this site before the calculator exists
Browse the catalogue
In development04 / 05

Casing design

Loads, ratings and the margin between them

Setting depths from the pore and fracture window, string selection, and each string checked against burst, collapse, tension and triaxial limits for the load cases a completion actually sees: kicks, tubing leaks, temperature, drag and buckling. The rating, the de-rated rating and the factor between them, with the rule set named.

  • Setting depths and kick tolerance from the pressure window
  • Burst, collapse, tension and triaxial checks for named load cases
  • Design versions kept by name, so a revision can be compared with the last
Casing design: loads, ratings and the margin between themcollapseburstDt0.875 t
Planned05 / 05

Equipment database

Tubulars and tools, as templates you can run

A catalogue of tubulars and completion equipment — casing and tubing sizes, packers, nipples and the rest — with templates and assemblies that can be added to a string in one step. The one part of CompletionLab with nothing built yet.

  • Casing and tubing sizes by designation
  • Templates and assemblies added to a string in one step
  • The source the schematic and the tally will pick from
Equipment database: tubulars and tools, as templates you can runTubingPackerNippletemplates · add one to a string

Honestly

Five questions, five different answers.

These get asked as one question — is it ready — and they are not one question. Confusing them is how a product page lies by accident, so every answer below is derived from the same flags the badges on this site read.

  1. 01

    Is it written yet?

    Partly, and this page says which parts. The schematic builder, tally, calculators and casing design are in development; the equipment database is planned. Of the 13 calculators catalogued, none of them compute anything yet — what is published for those is the method, not the software.

  2. 02

    Can I download it?

    There is nothing to download, now or later: CompletionLab is being built for the browser. When there is a public version, this site will link to it rather than describe it.

  3. 03

    Can I use it right now?

    Not yet. The tools are still being built, and there is no public version to open.

  4. 04

    Do I need an account?

    No, and there is nothing to sign in to. Everything here is kept in this browser and nothing is sent anywhere. There is no account to sign in to, so clearing site data clears this.

  5. 05

    Can I buy it?

    Nothing is for sale — there is no price, no checkout and no licence — and no decision has been made about how, or whether, CompletionLab will be offered commercially. If that changes it will be said on the roadmap and in the changelog before anywhere else.

All of it

Built, in development and planned, in one table.

Assembling this otherwise means reading three pages. Every row is derived from the same data the rest of the site renders, so it moves the day something ships.

0 of 5 tools built · 0 of 13 calculators built

What is built, what is in development and what is planned, across the five tools and the calculator catalogue
PartWhat it isToday
The five tools
Schematic builderThe well, drawn from what is actually in itIn development
TallyJoints, lengths and depths that always add upIn development
CalculatorsThe cased-hole arithmetic, with the relation shownIn development
Casing designLoads, ratings and the margin between themIn development
Equipment databaseTubulars and tools, as templates you can runPlanned
The calculator catalogue
Pressure0 of 4 builtPlanned
Fluids0 of 3 built · 1 still needs a completion engineerPlanned
Wellbore0 of 2 builtPlanned
Tubulars0 of 2 built · 2 still need a completion engineerPlanned
Logging0 of 2 built · 1 still needs a completion engineerPlanned

Read how it will work.

Every calculator on this page is still in development. The method notes show the relation each one solves, the units it accepts and, for most, a worked example you can check by hand.