Pressure, fluids, wellbore geometry, tubulars and depth control. None of them are built yet. What is published for each is the relation it will use, the units it expects and what it assumes — that part you can check today.

All calculators

13 calculators

Planned

Pressure

Hydrostatic pressure

Column pressure at depth, and the margin either side of it

The first number on almost every cased-hole programme: what a static column of one fluid exerts at a given true vertical depth. It will take density in any of the units the industry actually writes it in, and give back the pressure, the gradient and the equivalent mud weight together, because those three are the same statement and quoting one without the others is how a margin gets misread.

  • Density in ppg, specific gravity, lb/ft³ or kg/m³
  • Pressure, gradient and equivalent mud weight from one entry
  • Overbalance against a stated pore or fracture pressure

P = 0.052 × MW × TVD

Re-derived
Planned

Pressure

Bottomhole pressure

Surface pressure carried to depth, gas or liquid

Converts a measured surface pressure into a bottomhole pressure, and back. For a liquid column that is an addition; for a gas column it is not, because the gas compresses under its own weight and the gradient changes with depth. Treating a gas column as though it had a constant gradient is a well-control error, so the two cases will be separate entries rather than one with a checkbox.

Sourced
Planned

Pressure

Kill sheet

Kill weight, circulating pressures and the pressure schedule

The arithmetic behind a driller's or wait-and-weight kill: kill weight from shut-in drillpipe pressure, initial and final circulating pressure, and the pressure step-down schedule from surface to bit. It is a small set of relations that has to be right under time pressure, which is exactly the case for having it laid out rather than done on a whiteboard.

Re-derived
Planned

Pressure

Formation integrity

LOT and FIT reduced to a working pressure limit

Turns a leak-off or formation integrity test into the two numbers that get used afterwards: the equivalent mud weight the shoe will hold, and the maximum allowable annular surface pressure at the current mud weight. MAASP moves every time the mud weight does, which is the part most easily left stale on a drilling report.

Re-derived
Planned

Fluids

Fluid column

Layered columns and the U-tube between them

A well is rarely full of one fluid. This handles the stack: brine over mud over cement, a gas cap, a spacer in the middle, and works out what the column exerts at any depth and where the two sides of a U-tube come to rest. The answer to "will it flow back when I open it" is a column balance, not a single hydrostatic.

Re-derived
Planned

Fluids

Displacement and pills

Volumes, strokes and where the interface actually is

Displacement volumes and pump strokes for a full or partial circulation, and placement of a pill at a chosen depth. The useful part is the running position of the interface: knowing the total is not the same as knowing where the top of the spacer is after 340 strokes.

Re-derived
Planned

Fluids

Brine density

Density at temperature and pressure, and the crystallisation point

Completion brines are not incompressible and their density is quoted at surface conditions. At depth they are hotter and under pressure, and a column designed at surface density can end up underbalanced. This also carries the crystallisation temperature, which is the number that decides whether a brine can sit on surface overnight in winter.

Needs review
Planned

Wellbore

Several strings in one hole

Capacity when two strings share an annulus at the same depth

The capacity that is left when two or more strings occupy the same depth — a dual completion, a velocity string run alongside a tubing, or control lines and encapsulation taken off the annulus rather than ignored. AT THE SAME DEPTH is the whole of the difference: with one string at any given depth the annular area is π/4(D² − d²), and that single-string case is not what this entry covers. Two or more at once makes it π/4(D² − Σdᵢ²), which is what this entry adds.

Re-derived
Planned

Wellbore

Abandonment plugs

Slurry volume, plug length and the balance point

Cement volumes for plug and abandonment: slurry for a nominated plug length, spacer either side, and the balance point for a balanced plug. Regulator-driven work where the plug length is prescribed, so the question is usually volume for a given length rather than the reverse.

  • Slurry and spacer volumes for a nominated plug length
  • Balanced plug calculation with the displacement to leave it in place
  • Excess allowance stated separately rather than folded in
Sourced
Planned

Tubulars

Tubing forces

Length change and packer loads through the four effects

Tubing movement and packer load through the classical four effects — piston, buckling, ballooning and temperature — for the pressure and temperature changes a completion sees between running, testing, stimulating and producing. The temperature term alone is often the largest and the one most often left out.

Needs review
Planned

Tubulars

Collapse and burst

Pipe body ratings against a stated load case

Collapse and internal yield ratings for casing and tubing, checked against the differential a given operation imposes. The collapse side is not one formula but four regimes selected by slenderness, and picking the wrong regime is the usual way a rating comes out optimistic.

Needs review
Planned

Logging

Depth correlation

CCL and gamma ray tied back to a reference log

Depth correction for a cased-hole run: matching casing collars and gamma-ray markers against the reference log, and carrying the correction through to a perforating or setting depth. The number that matters is the shift applied and the confidence in it, which is why both will be reported rather than a single corrected depth.

Sourced
Planned

Logging

Wireline stretch

Cable stretch, weak point and safe pull

Elastic stretch of a wireline cable under toolstring weight and overpull, and the tension at which the weak point is designed to part. Stretch is a depth-control problem and weak point is a safety one, but both come off the same tension, which is why they belong on one page.

Needs review

The divisions

Five kinds of question, and what each one is about.

The categories are not filing: they are the five places a cased-hole day actually gets arithmetic wrong, and each one is drawn here by the calculator that carries it best.

Pressure: What a static column exerts, what a shut-in well is holding, and how much of that the shoe will take before it breaks down.MWTVD0pressureP

Pressure

4 methods

What a static column exerts, what a shut-in well is holding, and how much of that the shoe will take before it breaks down.

Gets wrong the depth. Every relation in this category is vertical, and measured depth in a deviated well overstates all of them.

Fluids: Layered columns, the U-tube between two of them, and the volumes and strokes that move one fluid past another.ρ₁ h₁ρ₂ h₂ρ₃ h₃ρ₃ hₜΔhannulustubingthe two balance, they do not level

Fluids

3 methods

Layered columns, the U-tube between two of them, and the volumes and strokes that move one fluid past another.

Gets wrong averaging. A plain mean of the densities weights a short heavy layer the same as a long light one, and even a correctly length-weighted mean gives only the figure at the bottom — the pressure at every depth above it depends on which fluid sits where.

Wellbore: Capacity and volume for every string in the hole, and the slurry that goes in when the well is being left.Dd₁d₂Casing IDAnnulusTubing ODs

Wellbore

2 methods

Capacity and volume for every string in the hole, and the slurry that goes in when the well is being left.

Gets wrong reading a diameter off the tally. Annular capacity is worked on the published internal diameter, never the nominal outside one.

Tubulars: What the pipe does under load, and what the pipe body is rated to survive before anything is run.collapseburstDt0.875 t

Tubulars

2 methods

What the pipe does under load, and what the pipe body is rated to survive before anything is run.

Gets wrong the nominal wall. A rating taken on nominal rather than on the wall a joint is permitted to have overstates the whole string.

Logging: Where the tool actually is, against where the log says it is, and how much cable is between the two.referencethis runΔdthe short joint fixes the tie

Logging

2 methods

Where the tool actually is, against where the log says it is, and how much cable is between the two.

Gets wrong applying the shift once. A correction picked at one collar and used at one depth is a coincidence, not a correction.

Method

What has been checked, and what has not.

Whether a calculator exists and whether its method has been reviewed are different questions, so they carry different badges. This is the second one.

4

Needs review

Needs a completion engineer, or tables this repository does not hold. Treat the relation as an outline, not as a figure to work from.

3

Sourced

A standard published method. The coefficients are quoted from the named reference and have not been independently re-derived here.

6

Re-derived

An exact identity or unit conversion, re-derived from first principles. The constant is arithmetic rather than a fitted value.

4 of 13 still need a completion engineer to sign off the method. They are marked on every card, and they will stay marked until someone has actually looked.

Is the one you need missing?

The catalogue is what a cased-hole day actually needs, as far as we can tell from the outside. If something obvious is absent, or the order is wrong, that is useful to hear — nothing about the sequence is fixed yet.