Skip to content
All calculators
FluidsPlannedRe-derived

Fluid column

Layered columns and the U-tube between them

About this calculator

A well is rarely full of one fluid. This handles the stack: brine over mud over cement, a gas cap, a spacer in the middle, and works out what the column exerts at any depth and where the two sides of a U-tube come to rest. The answer to "will it flow back when I open it" is a column balance, not a single hydrostatic.

  • Any number of layers, each with its own density and interval
  • U-tube balance between tubing and annulus
  • Static level after an underbalanced displacement

Method

Re-derived

Field units

P = Σ (0.052 × ρi × hi) Balance: Ptbg + Σ tubing = Pann + Σ annulus

Symbols

ρi
Density of each layer · ppg
hi
Vertical interval of each layer · ft
Psi
Surface pressure each side · psi
P
Pressure at any depth · psi
ΔP
Differential across the U-tube · psi
hs
Static fluid level · ft

Assumptions

  • A sum of exact hydrostatics, so the arithmetic is exact. Every hi is a VERTICAL interval — in a deviated well the along-hole lengths must be converted first.
  • Interfaces are sharp. Real spacers mix, and a contaminated interface has neither density.
  • Static. A U-tube in motion is a transient problem this does not model.
  • Compressible layers — gas, foamed cement — are not a fixed density over their interval.

Reference

Definitional, from the hydrostatic relation.

Worked example

Re-derived

A brine cap over mud over a cement column, summed rather than averaged.

Given

ρi
8.6 / 10.2 / 14.1 ppg
hi
3,200 / 2,400 / 1,800 ft
Psi
0 psi

Working

  1. 01Brine, 3,200 ft
    12 ÷ 231 × 8.6 × 3,2001,429.61 psi
  2. 02Mud, 2,400 ft
    12 ÷ 231 × 10.2 × 2,4001,271.69 psi
  3. 03Cement, 1,800 ft
    12 ÷ 231 × 14.1 × 1,8001,318.44 psi
  4. 04Total at 7,400 ft
    1,429.61 + 1,271.69 + 1,318.444,019.74 psi

Worth knowing

A plain average of the three densities, 10.97 ppg, over the 7,400 ft gives 4,215.76 psi — 196 psi heavy, because it gives the 1,800 ft of cement the same weight as the 3,200 ft of brine. A length-weighted mean (10.46 ppg) does reproduce the bottomhole figure, because it is the same sum written another way, but only at the bottom: at 3,200 ft the column is 1,429.61 psi of brine, not 1,738.27 psi of averaged fluid. Pressure at any depth above the base needs the layers, which is why this calculator is separate from the hydrostatic one.

Preview

A design preview of a calculator that is not built yet. Nothing here is behind a sign-in — there is nothing to sign in to.

Tell us you want this one

Interface

What it takes, and what it gives back.

Field units first, because that is what the programme and the daily report are written in. Where a quantity is dimensionless there is no metric column to fill.

Inputs

Inputs to the Fluid column calculator
SymbolQuantityFieldSI
ρiDensity of each layerppgkg/m³
hiVertical interval of each layerftm
PsiSurface pressure each sidepsikPa

Outputs

Outputs from the Fluid column calculator
SymbolQuantityFieldSI
PPressure at any depthpsikPa
ΔPDifferential across the U-tubepsikPa
hsStatic fluid levelftm

Scope

When this is the wrong tool.

A right number from the wrong calculator is the failure worth designing against, so each of these names the condition rather than the calculator.

Fluids

Related calculations.

The ones that tend to be done in the same sitting, and that share assumptions with this.

Planned

Fluids

Displacement and pills

Volumes, strokes and where the interface actually is

Displacement volumes and pump strokes for a full or partial circulation, and placement of a pill at a chosen depth. The useful part is the running position of the interface: knowing the total is not the same as knowing where the top of the spacer is after 340 strokes.

Re-derived
Planned

Fluids

Brine density

Density at temperature and pressure, and the crystallisation point

Completion brines are not incompressible and their density is quoted at surface conditions. At depth they are hotter and under pressure, and a column designed at surface density can end up underbalanced. This also carries the crystallisation temperature, which is the number that decides whether a brine can sit on surface overnight in winter.

Needs review

Does this match how you actually work it?

The assumptions above are the part worth arguing with. If one of them does not hold on the wells you run, that changes what gets built and how.